2022/0220/GR
EC/EFTA
GR Grèce
  • B00 - CONSTRUCTION
2022-07-11
2022-04-20

Public Works and Studies, Adjusting and destressing of continuous welded rail tracks (CWR) with hydraulic jacks

Approval of eighty-two (82) Hellenic Technical Specifications (HTS), the application of which is mandatory in all public works and studies.

ELOT TS 1501-07-03-03-54 Adjusting and destressing of continuous welded rail tracks (CWR) with hydraulic jacks

Approval of eighty-two (82) Hellenic Technical Specifications (HTS), the application of which is mandatory in all public works and studies.

ELOT TS 1501-07-03-03-54 Adjusting and destressing of continuous welded rail tracks (CWR) with hydraulic jacks
The purpose of this Technical Specification is to lay down the requirements for adjusting and destressing of continuous welded rail tracks (CWR) with hydraulic jacks.