2022/0106/PL
EC/EFTA
PL Poland
  • N20E - Electricity
2022-05-24
2022-03-08

Offshore wind farms and assemblies of equipment used for power evacuation from an offshore wind farm to the consumer’s demarcation point

Draft Act amending the Maritime Safety Act and the Act on Maritime Areas of the Republic of Poland and Maritime Administration

For an offshore wind farm located in the Polish exclusive economic zone and for an assembly of equipment used for power evacuation from an offshore wind farm, it is necessary to obtain: prior to the commencement of construction – a design certificate confirming the compliance of the building plans and specifications with the technical standards specifying the requirements to be met by an offshore wind farm or assembly of equipment;on completion of construction
– a certificate of authorisation for placing in service confirming that the construction process complies with the building plans and specifications and the certificate of design conformity;

during operation
– a certificate of operational safety confirming the completeness and correctness of the documentation in terms of proper maintenance and servicing of an offshore wind farm or assembly of
equipment.