2018/0317/PL
EC/EFTA
PL Poland
  • I10 - Metrology
2018-10-08
2018-07-11

Gas meters and volume conversion devices

Draft Regulation of the Minister of Entrepreneurship and Technology amending the Regulation on the requirements to be met by gas meters and volume conversion devices, and the detailed scope of checks to be carried out during the legal metrological inspection of those measuring instruments

The draft regulation adapts the regulation which is being amended to the Regulation of the Minister of Development and Finance of 13 April 2017 on the types of measuring instruments subject to legal metrological inspection and the scope of such inspections.

The draft sets out a detailed scope for checks performed during the re-verification of volume conversion devices and repeals the provisions regulating the initial verification of gas meters and volume conversion devices in that regard.

Furthermore, the draft sets out the performance requirements and the metrological characteristics subject to inspection during re-verification for volume conversion devices and supplements the regulation with provisions regulating the inspection requirements for the re-verification of gas meters placed on the market or brought into use by means other than a conformity assessment.