2022/0778/GR
EC/EFTA
GR Griechenland
  • B00 - BAUWESEN
2023-02-09
2022-11-15

Public Works and Studies, Waterproofing of upstream slab joints of concrete faced rockfill dams (CFRD) with metallic strips

Approval of eighty (80) Hellenic Technical Specifications (HTS), the application of which is mandatory in all Public Works and Studies.

ELOT TS 1501-13-02-08-03 Waterproofing of upstream slab joints of concrete faced rockfill dams (CFRD) with metallic strips

Approval of eighty (80) Hellenic Technical Specifications (HTS), the application of which is mandatory in all Public Works and Studies.

ELOT TS 1501-13-02-08-03 Waterproofing of upstream slab joints of concrete faced rockfill dams (CFRD) with metallic strips
The purpose of this Technical Specification is to lay down the requirements for the supply and installation of copper or stainless steel waterstops on the perimeter joint between the upstream slab and the block of concrete faced rockfill dams (CFRD), see Figure 2(5).