2022/0267/GR
EC/EFTA
GR Griechenland
  • B00 - BAUWESEN
2022-07-12
2022-04-21

Public Works and Studies, Impervious embankment of concrete faced rockfill dams (CFRD)

Approval of eighty-two (82) Hellenic Technical Specifications (HTS), the application of which is mandatory in all public works and studies.
ELOT TS 1501-13-02-06-00 Impervious embankment of concrete faced rockfill dams (CFRD)

Approval of eighty-two (82) Hellenic Technical Specifications (HTS), the application of which is mandatory in all public works and studies.

ELOT TS 1501-13-02-06-00 Impervious embankment of concrete faced rockfill dams (CFRD)
The purpose of this Technical Specification is to lay down the requirements for the construction of the impervious embankment of concrete faced rockfill dams (zone 1A). This zone provides additional protection to the joints between a concrete facing and its laying stone, in case of dam deformations.