A standardised set of specifications is a collection of texts detailing standardised services, for legal and technical provisions and for items in future specifications. This collection includes the services for a specific subject area as a whole or in respect of sub-fields.
Permanent preliminary remarks
01 - Planning and inspection of structures
02 - On-site overheads
04 - Subsoil investigations
06 - Preliminary work, removal work and earthworks
08 - Trenches for pipes and cables
10 - Pipes, channels, waste water disposal and pressure drainage systems
11 - Cable work
12 - Shafts and covers
13 - Well sinking and water supply
14 - Underground restoration of pipes
15 - Underground installation of pipes
19 - Excavation work and excavation support
20 - Underground engineering
21 - Dewatering and water diversion
22 - Anchoring and injection works
23 - Near-surface geothermal energy
25 - Subgrade and unbound base courses
26 - Bituminous base courses and surface courses
28 - Concrete paving, cement-stabilised base courses
29 - Paving work, kerb edging
31 - Concrete, reinforced concrete and masonry work
32 - Surface protection and waterproofing of concrete
35 - Steel construction
36 - Surface protection of metal
37 - Drives for hydraulic steel structures
41 - Bridge equipment
42 - Noise barriers
43 - Road equipment, restraint systems
44 - Traffic light systems
45 - Traffic signs
46 - Protective barriers for amphibians and game, fences
47 - Structure repair works
51 - Reinforcement of slopes, banks and beds, stone walls
52 - Rockfall prevention systems
53 - Landscaping
57 - Restoration of contaminated sites and contaminated land
58 - Recycling of materials
62 - Excavation works (underground)
63 - Support measures (underground)
64 – Drainage works (underground)
65 - Waterproofing (underground)
66 - Concrete work (underground)
67 - Ancillary works (underground)
68 - Building works for geotechnical measurements (underground)
70 - Drilling and testing (underground)
72 - Jet grouting (underground)
73 - Pipe roofing (underground)
74 - Additional measures (underground)
75 - Special measures (underground)
77 - Geotechnical measurements (underground)
81 - Track gravel
82 - Point gravel
83 - Slab track
87 - Ancillary works, superstructure
88 - Ballast, track layout and point positioning
89 - Components (delivery)
90 - Tests
98 - Scheduled work